Suez will be performing work in several areas of Lambertville on 9/29 and 9/30. Please see the full list below. 

9/29/2020
  • 251 North Main Street (roadway/sidewalk)
  • 37 North Main Street (roadway/sidewalk)

9/30/2020
  • Block, 1076 Lot 14 Church Street (roadway/sidewalk)
  • Block, Lot 14.01 Church Street (roadway/sidewalk)
  • Block, Lot 14.02 Church Street (roadway/sidewalk)